From:                              route@monster.com

Sent:                               Friday, April 29, 2016 3:30 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: osp engineer

 

This resume has been forwarded to you at the request of Monster User xapeix03

muhammad shahid 

Last updated:  01/07/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: AutoCAD Drafter

Resume Value: m7mx56y4w3s7t99v   

  

 


March 2001-2003

Telecom Support Services (Pvt.) Ltd

CAD Assistant.

Job Description: Responsibilities included:

·         Digitization & CADing of Web-based GIS (Geographical Information System)

·         Application in ESRI’s range of GIS products for 258,077 lines of Islamabad / Rawalpindi

·         Region for Pakistan Telecommunication Company Limited (PTCL).

·         Cable Network planning drawings generation for the IDR project (AM/FM/GIS) project of P.T.C.L.

·         Q.C of drawings / maps for conversion to GIS.

·         Standardization and Conversion of Micro station drawings / maps to GIS Software Arc View defining standard data fields.

·         Tagging of Data in Arc View.

·         Network analysis of Telecom Data using Network Analyst extension of Arc View.

·         Working on raster data, Hybrid data and Vector data in Micro Station.

·         Heads up digitizing, of scaled drawings and Route maps.

·         Optical Fiber Construction Digitizing of Route maps on scale.

·         Experience of Scanning, Digitizing & Plotting.

March 2000-2001                           

City Computer Services (Pvt.) Ltd

Hardware Assistance

Job Description: Responsibilities included:

·         My prime responsibilities are - Monitor repair -  Power Supply repairing -  System assembling - Assist Hardware Assistant in different projects.

·         Professional Qualification:

·         Six months Cartificate  GIS 9.2 , GPS , Remote SensingAwarded   

·         Diploma in National CAD Engineer (Telecom) Institute of Engineers & Technicians (Regd.) Lahore.

·         Six months Computer Training Certificate in Arc View GIS including Telecom Support Services (Pvt.) Ltd

·         3D Studio Max, Adobe Photoshop Skill Development Council National Training Board. (Labor and Manpower Division) Government of Pakistan.

Academic Qualification:

       B.A Allama Iqbal Open University Islamabad .(continue)

·         HSSC Allama Iqbal Open University Islamabad .

·         2 Years Vocational Certificate in Electronics from New Pak Technical Institute, Rawalpindi.

·         SSC Science from Pak National Grammar Secondary School, Karachi.             

·         One Year Course of Elementary Drawings from Pak National GrammarSchool,Karachi.

·         Reference:-

1.        Rezwan Abbass  

ATHEEB TELECOM Riyadh, SA

(Senior Manger Planning)

        Cell: +966 559832321

        2.    Binyamine  Etisalat Logo

Optical Fiber Access Network Projects Etisalat UAE.

        Cell: 00971503095836

3.        M.Saleem Shuja Manger Outsourcing

ZTE Telecom Pakistan

Cell”00923145111724

4.        Muhammad Asif

Huawei Telecom Technical Director Bahrin

Cell:: 0096896953213

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Professional Expertise:

 

Designing  Packages:-

 


Aspire

I Have More Then 8 Year Experience in Developing OSP OR ISP & Civil & FTTH Telecom Projects Engineering Drawings.

I Have More Then 3 Year of Experience in Arc View GIS Develop Land Base OSP Cable Network planning drawings generation for the ITR (AM/FM/GIS) project of PTCL Civil & Telecom Drawings.

Language Skills:-                           

Language

Read

Write

Speak

English

Excellent

Excellent

Fair

Urdu

Excellent

Excellent

Excellent

Punjabi

Excellent

Excellent

Excellent

 


CAREER HISTORY

Full Time Assignments: Organization:             

    North Sindh Urban Services Corporation (NSUSC).

Duration:                             October 2011 to till date

Designation:                            GIS Assistant.

·         Sukkur New, Sukkur City, Shikarpur City, Larkana ,Khirpur city, Rorhi City of Municipal GIS Data Prepeard.

·         Skip Container , Disospsal station, Land fill Site, Sewerage Pipe Line.

·         Sukkar city new pindh UC-12 prepared the GIS map.

·         All six city Data collected survey with GPS Coordinate.

Unicom Pakistan (Pvt) Ltd. (GIS Division Islamabad)                            

Duration:                             August 2009 to till date

Designation:                            Assistant Manager CAD

Job Description: Responsibilities included:

·          Completed Work of Planning with Huawei of GPON Pilot Project of PTCL (5K) Karachi.( FDH-I To FDH-XIII) Prepared the High Level & Low Level Design Network.

·          MSAG PTCL Project Planning at Karachi.

·         Completed of FTTH Al-Humra Project Jeddah S A.

·         Preparation of Proposed Long Haul Optical Transmission Network for Waird Telecom, Kampala, Uganda Project.

·         Preparation of Proposed Route Layouts Central & South Zone (Umair Kot to Seeta OFC PTCL Project).USF

·         Preparation of Proposed OFC Route Layouts of USF Baluchistan Package II.

1. Google Image Digitization.
2. CAD drawing with GIS Software
3. Updating of database records

4. GIS software’s 5. Cading Software’s

6.  Preparation of FTTH As built Layouts Plan.

       7. Knowledge of FTTH Building Site Surveys.

ZHONGXING TELECOM (ZTE) Services (Pvt.) Ltd.

   CAD Technician   December 2004-To 14-July 2009

Job Description: Responsibilities included: OSP & ISP Proposed and As built Plans.

·         Preparation of Proposed Route Layouts (Drawings) for all OFC  Project.

·         Preparation of Different OSP, ISP Civil Project Tower Design As built Work.

·         Preparation of Specification Drawings.

·         Preparation of Jointing/Splicing Plans for OFAN & OFJ&AN Projects.

·         Preparation of Pre Bid Survey Drawings.

·         Duct Schematic and Cable Schematic.

·         Quality check of all drawings and plans.

Preparation of various Engineering drawings using Micro station as well as AutoCAD.Worked in Energy Sector related drawings on Coordinates in Micro station.Prepared Bill of Quantities (BOQ’s) Worked on Raster, Vector and also havePreparation of all kinds of drawings. Project on Turnkey Basis.

ZHONGXING TELECOM Project:-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Muhammad Shahid

House # NE-1952 (3838A) First Floor Street # 34 Chah Sultan Rawalpindi

Mobile:+923325276917

PERSONAL INFORMATION

Father’s Name

Muhammad Luqman

Date of Birth

21February, 1978

Marital status

Married

Nationality

Pakistani (Domicile Punjab)

N.I.C No

Passport No.

37405-2950222-3

HK5142221

Religion

Islam

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mission Statement

To seek a challenging and rewarding opportunity in an advanced and competent Environment to equip myself as a highly skilled and competent professional. Use my Skills and potential to assistant  organization in achieving its goals, by which seeking long Term career with optimum growth.


 

 

 

Design Carrier Telecom:-

I started my carrier from the Cading and prepared the city maps on 1:1000 scales. I have worked on digitization of satellite images, new preparation of scaled maps surveyed by the surveyors, laying of cable (Telephone) networks, linking of CAD drawings with GIS software (ARC VIEW), updating of records in the database by extracting from the CAD drawings, scanning of Large maps, Printing the maps on scale. Then I joined the multinational organization ZTE (Zhongxing Telecom Pakistan Pvt. Ltd.) as a CAD Technician where I am responsible for collection of the data from the field, survey & designing of network, preparation of route diagrams, BOQ calculation, Preparation of the As-built diagrams, BOQ reconciliation etc.

 


OFAN 338.5K 

OFJ&AN 145K

DWDM Project

PTCL GIS Project

NLC Makran Coastal Highway Optical Fiber project

OFAN 14.5K 

SCO GSM

PTCL B& CC

PAKTELL GSM

CDMA WLL

D.I.Khan to Wana Transmission Project

D.G.Khan to Loralai Transmission Project.

NGN Project.

1462 & 1465 Project

1492 Project.

PTCL 1304

Metro DWDM 1551 Project

Telenor GSM Phase-IV

NOC NBI Project

PTCL USF Mansara Project

PTCL EVDO ITR (AJK)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

GIS Applications:-

 

Arc View 3.1 / 3.2/ 9.3

Designing  Packages:

 

AutoCAD 2004

2006,2008

Micro Station

/ SE / 7.1 “J”

 

 

 

 

 

 

 

 

 

 

Operating Systems:

Windows 95 / 98 / 2000 XP Professional

Ms-Dos

Microsoft Applications:

Microsoft Office PowerPoint 2003

Microsoft Office Visio 2003

Ms-Word, Ms-Excel

Louts Notes


 

 

 

 

 

 

 

 

 

Awarded Carrier:-

 

 

January 2009

Appreciation For Achievement Of

PAC PTCL DG Khan Loralai Project.

Transmission Department successfully

Achieves the PAC for PTCL DG Khan

Loralai Project. Attach here is the IOM

For appreciation 2008 duly signed by

CTO ZTE Pakistan.

 

December 2006:-

Awarded me Duly Signed by

GM Planning Wing Qing ‘S’ Grade

Outstanding Performers Appraisal

Report 2006 ZTE Pakistan.

 

 



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I require sponsorship to work in this country.

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US